Written from our own project experience in Bali, so you know the order of things before you start building.
✓Every stage from design to handover, with how long each one takes
✓How the PBG permit process works and which documents you need
✓The mistakes that most often blow the budget
You have land in Bali — but where do you actually start?
Almost everyone who comes to us starts at the same point. The land is bought, the villa is already vivid in their head, and some have even spoken to a builder. What's missing is the order of the steps.
That's usually where the trouble starts. Walls go up before the zoning is checked. The design is signed off before anyone discovers the plot allows only two storeys. Or, most common of all, the budget is based on a per-square-metre figure someone heard from a friend — and lands nowhere near reality on site.
Projects rarely fail on price. They fail on sequence.The wrong order means work gets redone. Redone work is the expensive part — not the material price.
What actually happens when the order is reversed
✓Build first, deal with permits later — the PBG becomes hard to obtain, and without it there is no SLF, so the building cannot legally be used commercially.
✓Design first, check zoning later — height limits, setbacks or land designation don't match, and the design has to be reworked from scratch.
✓Appoint a contractor without complete working drawings — the agreed price keeps moving, because what was priced was never fully defined.
✓Nobody supervising on site — the work finishes, but its quality only reveals itself after the first rainy season.
The order we work in
The guide lays out the exact sequence we follow on our own projects. Not theory — the stages you genuinely have to pass through, one at a time.
1Check the landZoning, designated use, height limit, setbacks and access — before a single line is drawn.
2Concept and rough budgetMatching what you want to what the land and the budget allow, while everything is still easy to change.
3Architecture and interior designPlans, elevations and the feel of each room, until you genuinely understand the building you're getting.
4Working drawings, structure and MEPThe drawings the builders work from and the quantity surveyor prices. The more detail here, the fewer surprises on site.
5PBG permitDocuments prepared and submitted on the basis of drawings that are already settled.
6Contractor selection and tenderComparing bids against the same set of drawings, rather than against each contractor's own guesswork.
7Construction and supervisionProgress, quality and staged payments checked regularly — not only at the end.
8Handover and SLFThe building is inspected, defects closed out, and the paperwork put in order for legal and operational use.
What's inside
✓The full sequence from land check to handover, with an estimated duration for each stage.
✓The PBG permit process: which documents are needed, who prepares them, and where applications usually stall.
✓Cost items that rarely make it into the first budget, even though they aren't small.
✓Lump-sum versus daily-rate construction, and what each one risks for the owner.
✓A checklist to run through before signing a contractor's agreement.
✓The technical terms that show up in quotations, explained in plain language.
8 stagesfrom land to handover
PBG & SLFthe permit path explained
PDFstraight to your inbox
This guide is for you if…
✓You're preparing a house or villa in Bali, whether to live in or to rent out.
✓You already have the land but aren't sure what the first move is.
✓You've received several quotes and can't work out why they differ so much.
✓You don't have a technical background and would rather not learn construction jargon first.
Clients who understand the sequence are always the best to work with. Decisions come quickly, and nothing blindsides anyone halfway through.
The Sagema Studio team
Questions we get a lot
Is the guide really free?
Yes. We only ask for an email address so we can send you the file, and so we can let you know when there's something new.
Where does the file go?
To the address you enter, usually within seconds. If it hasn't arrived in five minutes, check your Spam folder or Promotions tab.
I'm still looking for land. Is it still useful?
Very. The opening section is about judging whether a plot is buildable, so it's useful well before you buy.
I'm a foreigner. Does this apply to me?
The technical stages and the permit process are the same. Land ownership structures for foreigners are a notary matter and best handled separately — we're happy to point you in the right direction.
Will you keep emailing me after this?
Occasionally, with more of the same kind of material. Every email has a one-click unsubscribe link, no explanation needed.
Can I ask you about my own project?
Yes. Reply to the email, or message us on WhatsApp. The first conversation is free.
Get the guide now
Free, sent straight to your inbox. Takes 30 seconds.
It's on its way
Check the inbox of
If it hasn't arrived within 5 minutes, check your Spam folder or Promotions tab.